City of Tutwiler Project - Blues Park Walking Trail Phase 1A Package

Project consists of the following scope of work: demolition of the existing site elements (with the exception of areas/elements not within the construction limits or items not labeled for removal on the Demolition Plan) such as, but not limited to: foundations, utilities, concrete paving, fencing, gravel areas, trees, signage, and other elements as noted, construction of one construction entryway which access Holly Street, as well as the construction of a concrete walking trail which includes color concrete paving in key areas, trail markings within the trail surface, site grading, irrigation sleeving, and erosion control measures. There are also seven Add Alternates for this project.
Bid Documents (click to expand/collapse)
Hard copy and electronic full sets of plans and specifications are available for purchase at contractors expense. To download files, you must register for a free account, if you already have an account, simply log in and select “Download” this entire job. Then proceed to the download queue on the left menu bar to receive your downloaded files. For questions about accessing the documents please contact Memphis Reprographics at 901-590-4862.
Name Size
Project Manual 3.4 MB