City of Tutwiler Project - Blues Park Walking Trail Phase 1A Package

Project consists of the following scope of work: demolition of the existing site elements (with the exception of areas/elements not within the construction limits or items not labeled for removal on the Demolition Plan) such as, but not limited to: foundations, utilities, concrete paving, fencing, gravel areas, trees, signage, and other elements as noted, construction of one construction entryway which access Holly Street, as well as the construction of a concrete walking trail which includes color concrete paving in key areas, trail markings within the trail surface, site grading, irrigation sleeving, and erosion control measures. There are also seven Add Alternates for this project.
Date Company Contact
1685546802
5/31/23 3:26 pm
Constructconnect 30 Technology Parkway South Suite 100
Norcross, GA 30092
Jemar Sagbigsal
Tel: 3236025079
1684850139
5/23/23 1:55 pm
Hemphill Construction Company P. O. Box 879
Florence, MS 39073
Lynn Campbell
Tel: 601-932-2060
Fax: 601-932-2550
1686840626
6/15/23 2:50 pm
jhayden 123 street
peabody, MA 01960
jake hayden
Tel: 6038542054