Milan Downtown Revitalization Phase IV - TDOT PIN: 129824.00

This project consists of improvements along Main Street, beginning at Church Street and ending at College Street, and on Cedar Street beginning at Main Street and ending at Second Street. Improvements include curb and gutter, sidewalks, crosswalks with ada curb ramps, decorative street signs, pedestrian lighting, landscaping, and pedestrian amenities, such as benches and trash receptacles. The project length is 0.150 miles.
Addenda (click to expand/collapse)
Name Size
Addendum No. 1 - 19299 857.5 KB