City of Lakeland - Clear Creek Interceptor Phase A

This project consists of the construction of approximately 16,000 linear feet (LF) of 42- inch diameter sanitary sewer, 3,900 LF of 18-inch diameter sewer and short runs of 10- inch and 24-inch diameter sewers and 4 foot to 7 foot diameter manholes (sewer system). The work includes 3 bore and jack crossings; several wetland and stream crossings; construction under Texas Gas Pipelines; construction under various utilities, construction under overhead electric distribution lines; dismantling two sewage lift stations; and connection to the Scott’s Creek Wastewater Treatment Plant (WWTP) influent lift station wet well.
Addenda (click to expand/collapse)
Download section as a Zip file free of charge
Name Size
Addendum No. 1 1.0 MB
Addendum No. 2 419.3 KB
Addendum No. 3 3.8 MB
Addendum No. 4 107.3 KB
BIDDERS QUESTIONS through 2023-02-02 175.7 KB
BIDDERS QUESTIONS through 2023-02-07 150.7 KB