City of Lakeland - Clear Creek Interceptor Phase A

This project consists of the construction of approximately 16,000 linear feet (LF) of 42- inch diameter sanitary sewer, 3,900 LF of 18-inch diameter sewer and short runs of 10- inch and 24-inch diameter sewers and 4 foot to 7 foot diameter manholes (sewer system). The work includes 3 bore and jack crossings; several wetland and stream crossings; construction under Texas Gas Pipelines; construction under various utilities, construction under overhead electric distribution lines; dismantling two sewage lift stations; and connection to the Scott’s Creek Wastewater Treatment Plant (WWTP) influent lift station wet well.
Bid Documents (click to expand/collapse)
An official list of bidders will be maintained at www.midsouthplanroom.com. Any bid submitted from a bidder not on the official bidders list will not be opened. To be placed on the bidder’s list, hard copy full sets of plans and specifications are available for purchase at bidders’ expense, or files may be downloaded for free from this plan room. To download files, bidder must register for a free account, if you already have an account, log in and select “Download” this entire job. For questions, contact Memphis Reprographics at 901-590-4862.
Name Size
Project Manual 69.9 MB