Lakeland FY2026 Concrete Project

This project consists of replacing the curb and gutter in the Woodland Park neighborhood. Additionally replacing the curb and gutter, a concrete valley gutter, ADA ramps, and installing a new ADA ramp in the Herons Ridge neighborhood.
Bid Documents (click to expand/collapse)
Name Size
FY26 Concrete Bid Documents 36.5 MB