Sanitary Sewer System Rehabilitation Program
The Project consists of furnishing all labor and materials necessary for cleaning, videoing, and lining sanitary sewers using the Cured-In-Place Pipe method and manhole rehabilitation. There is approximately 5,900 linear feet of 8-inch, 10-inch, 24-inch, and 36-inch sewer lines that need to be lined using the Cured-In-Place Pipe method, and approximately 100 VF of manhole that needs Level C manhole rehabilitation, and one manhole to be removed and replaced with new precast concrete manhole.