Public Projects

TC2025-38 PRC WC Johnson NC Boardwalk Replacement
Town of Collierville
Eads, TN
The purpose of this project is to remove and replace sections of the existing boardwalk within Johnson Park in a manner that minimizes environmental disturbance, particularly to adjacent wetland areas.
Marion Bleacher Storage
A&R Construction Company
10 Patriot Dr., Marion AR 72364
Dan Speer Industrial Park Lot 5 Mass Grading project
Barge Design Solutions
1340 Amos Hamlett Rd, Pulaski, TN 38478
The mass grading of Lot 5 to include three phased erosion control and any other Work indicated in the Contract Documents.
City of Bells Water Line Replacements
A2H, Inc.
Bells, Tennessee
The Project consists of water line installation, water line replacement, changing services to new line, replacement of fire hydrants and directional bores.
Buckeye Estates Subdivision
ACOT Associates Group, LLC
8979 Macon Road, Memphis, TN
Civil Plans
Poplar Street Lane and 3rd Street Stormwater Improvements
Barge Design Solutions
Macon, GA
Removal and replacement of the existing stormwater infrastructure at the intersection of Poplar Street Lane and 3ʳᵈ Street in downtown Macon, GA.
Memphis Innovation Corridor
Memphis Area Transit Authority
Memphis, TN
The Memphis Innovation Corridor project will provide for construction of a bus rapid transit (BRT) system connecting downtown, the Memphis Medical District, and the University of Memphis.
Renasant Convention Center Expansion Joint Replacement
LRK
255 North Main Street, Memphis, Tennessee 38103
Expansion joint replacement on level L2 to the Renasant Convention Center
Fish Box Renovations
Upland Architects
Cherryville, North Carolina
Renovation of existing tenant space
TCAT Improvements - West Region Automotive Building
braganza design/ GROUP
3070 Highway 64, Crump, TN 38327
Scope of Work includes 3 Phases. Phase 1 concerns the Construction of a new Automotive Building to include all associated site work, septic system, classrooms, workshops, offices, common areas and restrooms. Phase 2 concerns the renovations to the existing West Classroom Wing and associated site work. Phase 3 (ALT NO 1) concerns the renovations to the existing East Classroom Wing and new canopies for the Auto and Welding programs.