SBC Project No. 166/033-01-2016A - Mechanical Systems Modernization - SWTCC
The work includes removing an existing air handling unit and replacing it with a variable air volume air handling unit and associated variable air volume boxes; removing two existing packaged rooftop units and replacing them with two new packaged rooftop units.
Addenda
(click to expand/collapse)
Name | Size | ||||
Addendum 1 - Mechanical Systems Modernizations - STCC - 166-033-01-2016A | 235.3 KB |