SBC Project No. 166/033-01-2016A - Mechanical Systems Modernization - SWTCC

The work includes removing an existing air handling unit and replacing it with a variable air volume air handling unit and associated variable air volume boxes; removing two existing packaged rooftop units and replacing them with two new packaged rooftop units.
Addenda (click to expand/collapse)
Order this section for $0.00
Order files below for $0.00 each
Name Size
Addendum 1 - Mechanical Systems Modernizations - STCC - 166-033-01-2016A 235.3 KB