Bank and Streambed Stabilization for the City of Germantown, TN CDBG - Disaster Recovery Project
1. Lateral D – Stabilizing the west bank by armoring areas of concentrated flow. 2. Lateral E – Repair the damaged west abutment of the existing metal sheet pile grade control structure.
Addenda
(click to expand/collapse)
Name | Size | |||
Addendum No. 1 | 1.8 MB |