Bank and Streambed Stabilization for the City of Germantown, TN CDBG - Disaster Recovery Project

1. Lateral D – Stabilizing the west bank by armoring areas of concentrated flow. 2. Lateral E – Repair the damaged west abutment of the existing metal sheet pile grade control structure.
Addenda (click to expand/collapse)
Name Size
Addendum No. 1 1.8 MB