Mall and Tacoma Basins Sanitary Sewer Repairs
The project consists of approximately 8,760 linear feet of closed circuit television (CCTV) and cured-in-place pipe (CIPP) of 8-inch, 10-inch, and 12-inch gravity sewer mains, 2 protrusion removals, 81 service reinstatements, 440 vertical feet of manhole lining, 7 regrout chimney sections, and 4 rebuild benches.
Status
Accepting Bids
Bid Date | 12/19/24 10:00am |
Location
Auburn, AL
The City of Auburn, Alabama, (herein after referred to as City) will receive sealed bids until 10:00 a.m., local time, on Thursday, December 19, 2024 in the City Meeting Room, 144 Tichenor Avenue, Auburn, Alabama, and then publicly opened and read for furnishing all labor, materials and equipment necessary for the completion of the following project:
Mall and Tacoma Basins Sanitary Sewer Repairs
FOR SPECIFIC INFORMATION CONCERNING THIS PROJECT, PLEASE CONTACT MORGAN BELL, P.E., ENGINEERING MANAGER, BARGE DESIGN SOLUTIONS, INC. AT 334.707.2337 or Morgan.Bell@bargedesign.com.