Blues Park - Walking Trail & Phase 1A Site Elements

Project consists of the following scope of work: demolition of the existing site elements (with the exception of areas/elements not within the construction limits or items not labeled for removal on the Demolition Plan) such as, but not limited to: foundations, utilities, concrete paving, fencing, gravel areas, trees, signage, and other elements as noted, construction of one construction entryway which access Holly Street, as well as the construction of a concrete walking trail which includes color concrete paving in key areas, trail markings within the trail surface, site grading, irrigation sleeving, and erosion control measures. All demolition debris will be removed from the site and disposed on in a legal manner (this means that no demolished items/elements/material can be disposed of or sold to any entity within the city limits of the Town of Tutwiler). The site once free of all construction debris and walking trail installed, there will be sodding and seeding per the drawings and of all disturbed areas.
Bid Documents (click to expand/collapse)
Hard copy full sets of plans and specifications are available for purchase at contractors expense, or files may be downloaded for free from our online plan room. To download files, you must register for a free account, if you already have an account, simply log in and select “Download” this entire job. Then proceed to the download queue on the left menu bar to receive your downloaded files. For questions about accessing the documents please contact Memphis Reprographics at 901-590-4862.
Name Size
Project Manual - Blues Park CDs Phase 1A 4.0 MB