Blues Park - Walking Trail & Phase 1A Site Elements

Project consists of the following scope of work: demolition of the existing site elements (with the exception of areas/elements not within the construction limits or items not labeled for removal on the Demolition Plan) such as, but not limited to: foundations, utilities, concrete paving, fencing, gravel areas, trees, signage, and other elements as noted, construction of one construction entryway which access Holly Street, as well as the construction of a concrete walking trail which includes color concrete paving in key areas, trail markings within the trail surface, site grading, irrigation sleeving, and erosion control measures. All demolition debris will be removed from the site and disposed on in a legal manner (this means that no demolished items/elements/material can be disposed of or sold to any entity within the city limits of the Town of Tutwiler). The site once free of all construction debris and walking trail installed, there will be sodding and seeding per the drawings and of all disturbed areas.
Addenda (click to expand/collapse)
The Consultant will forward one (1) copy of all addenda to holders of each set of documents. All such addenda will become a part of the contract documents and subject to all conditions contained therein, and must be listed on the Bid Form for the bid to be accepted. Note: no addendum shall be issued within five (5) calendar days prior to the date set for opening of bids, unless said addendum, delays the opening of said bids.
Name Size
Addendum No. 1 134.6 KB