Hicksville/Jackson Improvement Project

NDR - Madison County Jackson Flood Control Project 7, Anderson-Sandy Detention Structures, Hicksville Channel Improvements, Project No. 54821

Status

Bidding Closed

Prebid Date6/16/22 2:00pm

Bid Date6/30/22 2:00pm

Company & Contacts

Barge Design Solutions
Trevor Cropp  
901-755-7166

Location

Project site is located in Jackson, TN along the Sandy Creek

Bid Information:

Separate sealed bids for channel improvement projects in Jackson, TN for HICKSVILLE CHANNEL IMPROVEMENT PROJECT, MADISON COUNTY JACKSON FLOOD CONTROL PROJECT 7, ANDERSONSANDY DETENTION STRUCTURES, GRANT PROJECT NUMBER 54821 will be received by the West Tennessee River Basin Authority located at 3628 East End Drive Humboldt, TN 38343 until 2:00 o’clock p.m., C.S.T. June 30, 2022, and then at said office publicly opened and read aloud.

The owner reserves the right to waive any informalities or to reject any or all bids.

Pre-Bid Information:

Prebid Conference will be on June 16, 2022 at 2:00 p.m. at the West Tennessee River Basin Authority located at 3628 East End Drive Humboldt, TN 38343.

Project Description:

The work to be performed under this Contract shall consist of furnishing all labor, materials, tools, equipment and incidentals and performing all work required to construct complete in place and ready to operate the improvements shown in the Contract Documents. These improvements include, but are not limited to, the following:
  • 1. Clearing, grubbing, and disposal of cleared and grubbed materials within the project including the invasive Kudzu.
  • 2. Earthwork and related operations, including, but not limited to, excavating all classes of material, handling, storage, transportation and disposal of all excavated and unsuitable or excess material, construction of fill material areas, placing and replacing fill materials around structures, preparation of subgrades, finished grading, and any other similar, incidental, or appurtenant earthwork operations which may be necessary to properly complete the project.
  • 3. Temporary and permanent erosion and sedimentation controls as shown on the Drawings.
  • 4. Mobilizing and demobilizing the prime Contractor’s and all Subcontractors’ forces, supplies, equipment, and incidentals at the Project site.
  • 5. Temporary stream crossings as shown on the Drawings, specified or directed by the Engineer, shall be included in the Erosion Control.
  • 6. Placing and spreading of stockpiled topsoil.
  • 7. Furnishing and setting TDOT Class A-1 machined riprap, grout, gabions, and grade control structures, and shall be performed in accordance the plans and specifications.
  • 8. Storm drainage utilities including drain piping, headwalls; manholes, including bedding, and backfill as shown on the drawings.
  • 9. Sanitary sewer aerial crossing including concrete pilings, anchor blocks, and steel casing.
  • 10. Temporary and permanent seeding associated with the project including supplying and installing seed, sod, and hydraulic seeding as shown on the drawings.

Questions:

Cutoff for all questions to the Project Engineer, Trevor Cropp by June 23, 2022 at 2:00 p.m. NO EXCEPTIONS. Questions shall be emailed to trevor.cropp@bargedesign.com.

Hard copy full sets of plans and specifications will be available for purchase at contractor’s expense, which will be fulfilled by the Mid-South Planroom (www.midsouthplanroom.com). To download files, you must register for a free account, if you already have an account, simply log in and select “Download” this entire job. Then proceed to the download queue on the left menu bar to receive your downloaded files. For questions about accessing the documents please contact Memphis Reprographics at 901-381-9811.