Sikeston K Center Safe Room / Multi-Purpose Building

Construction of a one-story, 4,628 SF safe space building that is primarily constructed with fully reinforced/grouted 12” concrete block and brick veneer w/steel beams, concrete over metal deck with a white fully adhered TPO roof membrane. The building contains an entry lobby, restrooms, auditorium, platform, storage, office, and utility closets. The building is supported by a generator within a separate enclosure.

Status

Bidding Closed

Prebid Date10/5/21 3:00pm

Bid Date10/14/21 2:00pm

Company & Contacts

FourFront Design
Ellen A. Wadley - ewadley@flemingarchitects.com  
901-767-3924

Location

1310 E. Salcedo Road, Sikeston, MO 63801

Bid Information:

The Sikeston R-6 School District will receive Bid for the following bid for the above referenced project. Submit sealed bid for the K-Center Safe Room/Multi-Purpose Building to the Sikeston R-6 Board of Education, 1002 Virginia St., Sikeston, Missouri 63801. All bids must be received on or before 2:00 p.m. (local time), October 14, 2021. Bids received after this time will not be accepted.

Schedule and Deadlines:
  • 9.24.21 Date Documents Issued- Memphis Reprographics
  • 10.5.21 at 3:00 pm Pre-Bid Meeting, K-Center, 1310 E. Salcedo Road, Sikeston, MO
  • 10.5.21 at 3:30 pm Meet potential General Contractors, 1310 E. Salcedo Road, Sikeston, MO
  • 10.8.21 at 5:00 pm Final Deadline to Submit Questions
  • 10.11.21 at 5:00 pm Final Addendum Deadline
  • 10.14.21 at 2:00 pm Deadline to Submit Bid
  • 10.15.21 at 2:00 pm Deadline to Submit Supplementary Information

The Owner reserves the right to reject any or all Bids and to waive informalities or irregularities in the bidding. Bids will be reviewed by the school district and their consultants following the reading of bids.

Pre-Bid Information:

A Pre-bid meeting will be held at 3:00 p.m. on Tuesday, October 5, 2021 located at K-Center, 1310 E. Salcedo Road, Sikeston, MO.

Meet the Potential General Contractor Event 3:30 p.m. will be held in the LIBRARY of the K Center, 1310 E. Salcedo Road, Sikeston MO 63801. Please note parking will be limited.

Project Description:

The Project consists of the construction of a one-story, 4,629 SF safe space building that is primarily constructed of fully reinforced and grouted 12” concrete block and brick construction with steel beams, metal deck, concrete on metal deck, roof insulation w/ white fully adhered TPO roof. The building contains an entry lobby, restrooms, auditorium, a platform, storage, office, and utility closets. The building is supported by a generator in its own protected enclosure. FEMA compliance required. Schedule of values shall include breakout of FEMA Eligible and Ineligible Building systems and components.

Hard copy full sets of plans and specifications are available for purchase at contractors expense, or files may be downloaded for free from our online plan room. To download files, you must register for a free account, if you already have an account, simply log in and select “Download” this entire job. Then proceed to the download queue on the left menu bar to receive your downloaded files. For questions about accessing the documents please contact Memphis Reprographics at 901-590-4862.